Document Module - Edit a Change Request | Ideagen
Skip to main content
There's more discussions to explore simply by registering for Ideagen Community. Join us and start speaking with your peers today!

Hi All,

The Document Owner is unable to update the ‘Implemented In Revision’ field ?

Does the document need to be effective with no draft versions to enable the owner to populate this field? 

In this scenario Version 03 is active and there is an Version 04 at Draft 

KR

Colin 

 

The picture is not Quality control essentials. 


Hi,

This QC document is stored within the Document module 

 


This ‘Implemented in Revision’ field is auto populated when you choose to pull through an existing accepted change request from an earlier revision into a new draft during the new draft creation process.

If the change request was against a draft version of a document, then you will be prevented processing a change request until both the document has been activated and the change request is accepted. Change request processing is designed to update active documents, not draft documents.


Reply